Aerial view of a golf hole with white sand bunkers around the green

Home/Services/Bunker Construction and Renovation

Bunker Construction and Renovation That Drains After Every Storm

Turf Rehab builds new bunkers, rebuilds failing ones and removes the ones your course doesn't need. We fix what's happening under the sand so your crew stops pumping water and shoveling washouts.

Bunkers

Bunker Construction Built Around Drainage

Bunker construction looks simple from the fairway: shape a hole, add sand, sod the edges. In practice, bunkers are one of the most common trouble spots on a golf course, and nearly every bunker problem starts with water. When a bunker can't drain, water sits on the floor, the subgrade soil turns soft and starts mixing into the sand, and storm runoff carries sand off the faces. Your crew spends the morning after every rain fixing the same bunkers.

Turf Rehab approaches bunker construction as a drainage project first. We're a golf course drainage and construction contractor based in Cambridge, NY. Our President, Mark Rowan, has 17 years of golf course construction experience and specializes in building drainage systems. Mark Luckhardt, our Turf Consultant, developed the 2-inch slit drainage process more than 35 years ago. That background shapes how we build a bunker floor, where we put the drain lines and how we keep surface water out in the first place.

We handle bunker work on its own or as part of a larger renovation. Our own crew does the shaping, drainage, sand and sod work. If you're planning a bigger project, see our golf course construction page.

Excavator shaping earth during golf course construction

Signs Your Bunkers Need Renovation

Most superintendents know which bunkers are the problem. The question is whether to keep patching or rebuild. These are the signs that patching has stopped working.

01

Standing Water After Rain

If water still sits in a bunker hours after a storm, the drainage underneath has failed. Old drain lines clog with fine soil and sand, get crushed by equipment or were never sloped to an outlet. Pumping the water out treats it for a day. The bunker will fill again next time.

02

Washouts on the Faces

Steep, flashed bunker faces lose sand every time surface water runs over them. Usually that water is coming off the surrounding turf, and nobody built a way to catch it before it reaches the bunker. Washouts leave bare faces, piles of sand on the floor and a crew rebuilding faces by hand.

03

Contaminated Sand

When the subgrade stays wet, soil and small stones work their way up into the sand. Bunkers that were bright and clean at construction turn muddy and hard. Once contamination sets in, adding fresh sand on top only buries the problem for a season or two.

04

Hours of Daily Repair

Add up the hours your crew spends pumping, raking washouts back up and hauling contaminated sand. That's a real labor cost every season. A properly rebuilt bunker handles storms better, keeps sand cleaner, washes out less and needs fewer daily repairs.

Our Bunker Construction and Renovation Services

We take on bunker work of any size, from one greenside bunker that floods to a full bunker program across the course.

01

New Bunker Construction

We build new bunkers to your architect's plan or work with your superintendent on placement and shape. Golf bunker construction starts with shaping the subgrade, building in a low point for drainage and cutting drain trenches to an outlet. Then we place sand, finish the edges and sod the surrounds.

02

Full Bunker Renovation

A full golf course bunker renovation strips out the old sand, removes contaminated material, reshapes the floor and faces and rebuilds the drainage. Clean sand goes back in at the right depth, and the edges are re-established with new sod. It's the right call when the bunker has failed on several fronts at once.

03

Bunker Drainage Rebuilds

Sometimes the shape and sand are fine and only the drainage has failed. We cut new drain trenches in the bunker floor, install pipe and connect it to an outlet or an existing collector line. We GPS-map the new lines so your crew knows where they are next time they're edging or adding sand.

04

Bunker Removal and Reshaping

Many clubs have bunkers that no longer make sense for how the course is played, or that cost far more to maintain than they add. We remove them, fill and grade the area so water sheds properly and grass it in. At North Shore CC in Wisconsin, we completed a bunker removal project on a timeline that weather had squeezed tight. Superintendent Joel Larsen said the job was precisely planned and carried out.

Bunker Liners: When They Help and When They Don't

A bunker liner is a layer placed between the subgrade and the sand. Some are fabric, some are sprayed on and some are made from a porous bonded aggregate. Their main jobs are to hold sand on the faces and keep the soil underneath from mixing into the sand.

Liners can make a real difference on steep faces and in soils that contaminate easily. What they can't do is make up for poor drainage. If water can't get from the bunker floor to a drain line and out to an outlet, a liner just gives it a nicer surface to sit on. So on every job, we build the drainage first and decide on a liner second.

We'll recommend a liner when the bunker shape, soil and budget call for one, and we'll tell you when the money is better spent on drainage and grading the surrounds.

Sharp bunker edge with fresh sand and surrounding turf

Bunker Sand, Depth and the Surrounds

The sand you put in a bunker matters almost as much as the drainage under it. Bunker sand needs to drain freely, stay firm enough that balls don't plug and hold its place on the faces. Sand that's too fine packs down and holds water. Sand that's too coarse or round shifts underfoot and won't stay up on a slope. We help you pick a sand that fits your bunker style, your budget and how your crew likes to maintain it.

Depth is the next piece. Too little sand on the floor and the subgrade shows through, mixing soil into the sand every time someone rakes. Too much on the faces and it slides down and buries the floor. We set the sand at a consistent depth across the floor and thinner up the faces, then firm it so it plays the same from one bunker to the next.

The turf around a bunker is where a lot of the water comes from. If the surrounds slope into the bunker, every storm pushes water and sand down the face. When we rebuild a bunker, we look at the grade of the surrounds and reshape them where needed so water is caught and carried away before it reaches the sand. Sometimes that means a small swale, sometimes a drain line at the top of the face. Fixing the surrounds is often the difference between a bunker that washes out every month and one that holds up all season.

The edges matter too. Clean, sharp edges keep turf from creeping into the sand and give the bunker a finished look. We re-establish edges with new sod at the end of every renovation, so your crew isn't trimming ragged lines for the next year.

Our process

How a Bunker Project Runs

Bunker work follows the same process we use on every project.

We start with a site visit, walking the bunkers with your superintendent and noting which ones hold water, wash out or get contaminated. Then we review the soil profile, because heavy clay and sandy ground behave very differently under a bunker. Next we lay out drainage and outlets using GPS and give you a cost breakdown by bunker or by hole, so you can choose what to do this season and what to phase in later.

Our crew handles construction, working hole by hole so the rest of the course stays in play. We schedule around tournaments and member events and adjust when weather moves the schedule. At the end, we walk every bunker with you for a final inspection and hand over the drainage map. If you're also dealing with wet fairways or low areas near the bunkers, our golf course drainage team can handle that in the same mobilization.

1

Site Visit

We walk the property with your superintendent and listen first.

2

Soil Profile

We check the profile, existing drainage and how water moves across the property.

3

GPS Layout

A layout built around how your crew mows, topdresses and aerifies.

4

Cost Breakdown

Pricing by hole or area, so the worst spots go first.

5

Installation

Our own crew, scheduled around your golf calendar.

6

Final Inspection

We walk the finished work with you and hand over the GPS maps.

Results

What Superintendents Say

Superintendents remember contractors who protect their course during construction. Christie at Portland CC in Maine said our staff was professional, detailed and hardworking over two falls of work.

You can see every club we've worked with on our project locations page.

“Our wettest areas have become our driest.”

A site visit turned into a full master drainage plan. Turf Rehab worked around the club's golf calendar, adjusted after severe weather and installed 2-inch drainage in the fairways.

NR

Nick Roth Golf Course Superintendent, The Tree Farm (SC)

Called Turf Rehab one of the best contractors the club has worked with

Over two falls of work at Portland, J.B. found the Turf Rehab staff professional, detailed and hardworking. Turf Rehab is now his first call for drainage.

JC

J.B. Christie Golf Course Superintendent, Portland Country Club (ME)

Praised a crew of tireless team players

A bunker removal project squeezed into a short, weather-affected window. Joel described the crew as tireless team players who planned the work carefully.

JL

Joel Larsen Golf Course Superintendent, North Shore Country Club (WI)

Asked the crew back for more drainage

Brian asked the crew back in November to install as much drainage on the property as possible.

BB

Brian Bromann Ivanhoe Club (IL)

FAQs

Questions we hear most

Bunkers hold water when the drainage under the sand has failed or was never built right. Drain lines clog with fines, get crushed or don't slope to an outlet, and heavy subgrade soil keeps water from reaching them. Rebuilding the drainage is the lasting fix.

Get in touch

Get Your Bunkers Draining Again

Send us a list of your problem bunkers, along with photos after a rain if you have them. We'll look at what's going on and come back with options that fit your schedule and budget. We answer requests within 24 hours, and you can reach us at (518) 321-0630, seven days a week from 8 AM to 6 PM.

Location11 Ave A, Cambridge, NY 12816

Phone, every day 8 AM to 6 PM(518) 321-0630

Tell Us About Your Site

We reply within 24 hours.